Ducted Air-Source Heat Pumps

Requirements
  1. New equipment for upgrades must hold the following HSPF2/HSPF efficiencies (cooling capacity; BTU/H):
    1. <65,000 Split-System, 8.1 HSPF2 or 9.6 HSPF
    2. <65,000 Single Package: 7.0 HSPF2 or 8.3 HSPF
    3. >65,000 and <135,000: 3.5 COP
    4. >135,000 and <240,000: 3.4 COP
    5. >240,000: 3.4 COP
  2. AHRI Certificate
  3. Projects must be installed by a licensed and bonded contractor
  4. Equipment or contractor invoice showing equipment order or purchase date, along with the installed cost
  5. Completed Commercial Air-Source Heat Pump Information Form (PDF)
  6. Post-inspection