Permits & Forms

Facility Interconnection Requirements

The following documents outline the requirements for connecting generating facilities to the Okanogan County PUD system.

Miscellaneous

Net Metering / Solar

Service Application

Tree Trimming / Vegetation Management

Washington State Permit Line Requirements

Washington State L&I Permit Requirements

person in safety gear using hand sawAre You a Do-It-Yourselfer? Don’t Forget the Electrical Permit!

A message from the Washington State Department of Labor & Industries

According to the Consumer Products Safety Commission, about 18,200 home fires are caused by electrical wiring each year, resulting in about 120 deaths, 520 injuries, and $450 million in property damage.

Protect Your Family & Your Property

  • An electrical permit is required. Washington state electrical safety laws require a permit and inspection for all new and additional electrical work. An electrical permit and professional inspection assures that your electrical work meets current safety code.
  • Do electrical work only if you are qualified. If you do not have a good understanding of electrical wiring and are not qualified, hire a licensed electrical contractor.
  • If you do your own electrical work, you must buy the permit and call for an inspection.
  • If you hire a licensed electrical contractor, your contractor must buy the permit and will get the inspection.
  • Never overload outlets, extension cords or electrical circuits. If your circuit breaker trips, either it is overloaded or a circuit has malfunctioned and should be inspected by a qualified person.
  • Keep your permit and inspection approval in a safe place for future reference. You may need it when trying to sell or refinance your home or to get insurance.
  • Remember: The surest way to safeguard your home is with an electrical permit and inspection. Lives depend on it!

Contact L&I For More Information

Visit the Washington State Department of L&I website for more information.